Tag

Building Construction Commencement - Building Information Ireland - Page 4

Medical Construction – €1.6m Galway Hospice Extension

By | Industry News

Dublin Road
Renmore
Co. Galway

Floor area: 634 Sq M

Started: 13th July 2015

Permission for proposed development works at the centre consisting of a single storey rear, east extension including partial reduction of part of existing building, a two storey side north extension, for additional bedroom accommodation, communal areas and ancillary service areas. A single storey courtyard extension, various elevation changes and site development works including blocking up existing access from Renmore Road via Church grounds and forming new pedestrian entrance from right of way to western boundary. Plus permission consequent on outline permission for new access road junction from Dublin Road (outline Pl. Ref.)

Galway Hospice Construction

Architect
McCarthy Keville O’Sullivan Ltd.
Block 1 Galway Financial Services Centre
Moneenageisha Road, Co. Galway
091 735611 | info@mccarthykos.ie | www.mccarthykos.ie

Applicant
The Galway Hospice
Dublin Road
Renmore, Co. Galway
091 770868 | info@galwayhospice.ie | www.galwayhospice.ie

Contractor
John Madden & Sons Ltd.
Kilmaine Rd
Ballinrobe
094 9541166 | info@johnmaddenandsons.ie | www.johnmaddenandsons.ie

Hospital Construction – €1.8m Our Lady’s Children’s Hospital Extension

By | Industry News

Our Lady’s Children’s Hospital
Cooley Road
Crumlin
Dublin 12

Floor area: 413 Sq M

Started: 23rd July 2015

The hospital construction development will consist of a three-storey extension to the hybrid cardiac catheterisation laboratory (planning reference 3533/13) providing a new Orthopaedic Theatre and support rooms at first floor, suspended over an existing car park, ground floor plant room and new roof-top plant room, all measuring 413 m2, with associated site works and adjustments to car park.

Clancy Hospital Construction

Applicant
Our Lady’s Children’s Hospital
Cooley Road
Crumlin, Dublin 12
01 4096100 | admissions@olchc.ie | www.olchc.ie

Architect
Cullen Payne Architects
56-58 Drury Street
Dublin 2
01 643 7300 | info@cullenpayne.ie | www.cullenpayne.ie

Contractor
Clancy Construction Ltd.
Ballyluskey
Drangan, Thurles, Co.Tipperary
091 52166 | build@clancyconstruction.ie | www.clancyconstruction.ie

Hospital Construction – €10m Cork University Hospital Extension

By | Industry News

Cork University Hospital
Wilton
Cork

Floor area: 2969 Sq M

Started: 8th July 2015

The hospital construction development will consist of the refurbishment and extension of the existing single storey paediatric unit located to the rear of the main hospital building, to provide new patient accommodation including the construction of a two storey extension over the existing single storey paediatric unit to provide accommodation for a new outpatient unit, day ward and research facilities with associated plant located on the roof, a new stair and lift block linking the new development to the main hospital building at ground and first floor levels, a new stair block to the rear of the development and associated external landscaping works.

Clancy Hospital Construction

Applicant
Health Service Executive – Southern Area
Cork Farm Centre
Dennehy’s Cross
Wilton Road, Co. Cork
021 4545011 | info@hse.ie | www.hse.ie

Architect
Pascall+Watson
149 Francis Street
Dublin 8
01 4734625 | info@pascalls.ie | www.pascalls.co.uk

Contractor
Clancy Construction
Drangan
Thurles, Co. Tipperary
052 9152166 | build@clancyconstruction.ie | www.clancyconstruction.ie

Medical Construction – €11m Nursing Home Development in Co. Mayo

By | Industry News

Mullauns and Morrison
Ballina
Co. Mayo

Value: €11m

Start Date: 22nd July 2015

Extension of duration of P10/703077 for development consisting of the construction of a 45 bedroom single storey nursing/residential care home to provide for 50 residential care home, to provide for 50 residents together with car parking, connection to public services, widening of access from Morrison Terrace and site development works to facilitate the medical construction development.

Ruane Builders Medical Construction

Applicant
Garballagh Developments Ltd.
Church Road
Ballina, Co.Mayo
096 22382

Consultant Engineer
David O’Malley & Associates
McHale Retail Park
Castlebar, Co.Mayo
094 902 3850

Contractor
Vincent Ruane Construction Ltd.
Church Road
Ballina, Co. Mayo
096 22382 | info@ruanebuilders.com | www.ruanebuilders.com

€4m Office Construction Commencing – Schoolhouse Lane East Dublin 2

By | Industry News

Commencement Notice:  07/08/2015

Site at no.s 30 31 32 Molesworth Street
Schoolhouse Lane East
Dublin 2

Floor Area: 3744 Sq M

Overall Cost: €4m

Commencement Notice: 07/08/2015

PROTECTED STRUCTURE: Planning permission for Office Construction development at this 0.16 ha site at no’s 30, 31 to 32 Molesworth Street and Schoolhouse Lane East, Dublin 2. No’s 30, 31 and 32 are all protected structures – RPS 5264, 5265 and 5266. Number 32 Molesworth Street is a RMP (DU018-020262). The development will consist of 1,349 sq.metres of office and ancillary office space to the rear of no’s 30, 31 and 32 Molesworth Street including: No. 30: demolition of 2 storey rear office extension (annex) with thrust out lavatory above and 1 to 2 storey rear mews. No. 31: demolition of the 1 storey portion of the return and the 2 storey office mews. No. 32: demolition of 1 to 3 storey over basement office extension to the rear and the 3 storey WC extension cantilevered over the 1 storey office extension. Construction of a new infill office construction development 4 storeys in height over basement with a gross floor area of 3,744 sq. metres (including basement, plant and ESB substation).

Collen Office Construction

Contractor
Collen Construction Ltd.
Riverview House
East Wall Road
Dublin 3
01 874 5411 | construction@collen.com | www.collen.com

Architect
John Spain Associates
50 Upper Mount Street
Dublin 2
Co. Dublin
01 6625803 | info@johnspainassociates.com | www.johnspainassociates.com

Applicant
Green REIT Ltd
Styne House
Hatch Street Upper
Dublin 2
01 241 8400 | website@greenreitplc.com

Construction Ireland – Q2, Almost 100 Munster Construction Commencements

By | Industry News

Construction in Ireland – Munster Commencements

The map below shows the regional distribution of almost 100 construction commencements in Munster during Q2 of 2015.  All key sectors are highlighted by the icons on the map with the notable density of projects expected in Cork and Waterford.  The largest of these projects by value was the Westpark Development in Shannon Co. Clare, which lodged a commencement notice on the 22nd May of this year.

Construction Ireland Munster

Full details on all construction in Ireland can be found by registering for a free 10 day trial on our website.

Building Information Ireland publishes data on all construction projects and planning activity in Ireland.  We are the producers of the National Housing Construction Index and the Building Information Index.  Our data caters for all construction sectors from early planning to project commencement phase.  Our clients use our services to generate new business and gain a greater knowledge of Construction Ireland hotspots.

€1.7m St. Brendan’s National School Construction Development in Co. Kerry

By | Industry News
Blennerville School Construction Well Underway

Works progressing well at St. Brendan’s National School, Blennerville, Co. Kerry. Ned O’Shea & Sons Construction Ltd. started work on this towards the end of last year. Our well travelled researcher Ciara picked up some nice shots earlier today.  Nice work Ciara!

St. Brendan's National School 2

St. Brendan's National School 4

Some contact details on this project from our school construction projects database at www.buildinginfo.com

Applicant
Department of Education & Skills
Portlaoise Road
Tullamore
Co. Offaly
057 9324300 | www.education.ie

Architect
Michael Williams Associates
Radio Kerry Centre
Tralee
Co.Kerry
066 7125888 | mwa@mwa.ie | www.mwa.ie

Consultant Engineer
Malachy Walsh & Partners
The Elm Suite
Loughmore Centre
Raheen Business Park
061 480164 | limerick@mwp.ie | www.mwp.ie

Contractor
Ned O’Shea & Sons Construction Ltd.
Rock Business Centre
Rock Street
Tralee
066 7121240 | info@nedoshea.com | www.nedoshea.com

Building Projects Taking on Average 79 Weeks to Commence

By | Industry News

Today Environment Minister Alan Kelly has announced plans for a review of An Bord Pleanala. Included in the terms of reference of this review is an analysis of how the body will meet the current and future demands made of it by a growing construction industry. Welcoming this review, Tom Parlon of the Construction Industry Federation (CIF) has pointed out that there are significant delays in the time taken for construction projects to go from an initial planning application to starting on site. Referencing figures produced in the Building Information Index Tom points out that the lead time for commercial construction projects is currently averaging at 79 weeks.

This lead time varies significantly for different sectors within the industry, with the lead time for residential developments standing at a massive 142 weeks.

Residential Commencements

Read the full article with Tom’s view in the Irish Independent today

http://www.independent.ie/opinion/comment/tom-parlon-failure-to-make-changes-will-keep-brakes-on-construction-31405663.html

 

Q1 & Q2 Building Projects Commencements

By | Industry News

2014/2015 Comparative figures per sector – Q1 & Q2

The image below compares the volume of building projects commenced in the Republic of Ireland per sector in 2014 versus 2015. Overall the comparison showed a mixed set of results with increases or stability year on year for building projects in the Commercial, Education, Industrial and Medical sectors but with declines in the Agriculture, Residential and Social sectors.

Building Projects Commenced

 

Building Information Ireland publishes data on all building projects in Ireland from early planning applications to commencement phase.  Subscribers generate new business and sales by having 24hr online access to literally 1000’s of building projects and essential contact details.  Visit our website for further information or register for a free 10 day trial.

Residential Construction – €81m Residential Development in Co. Dublin

By | Industry News

Large Residential Construction Development at:

Hollywoodrath
Hollystown
Dublin 15

Units: 435

Value: €81m

Commencement: 24th July 2015

Full 10 year planning permission for residential development on a site at Hollywoodrath, Hollystown, Dublin 15. The site is located on the southern side of the junction of the Ratoath Road and the R121 (Church Road), and to the north of the M2/N3 link road. The proposed development includes 435 no. dwelling units to be provided as follows: 156 no. units of house types A1 to A8 consisting of 2 storey, 4 bed semi-dretached houses ranging in size from c. 143 sq.m to 146 sq.m; 184 no. units of house tyes B1 to B9 consisting of 2storey, 3 bed semi-detached houses ranging in size from c. 125 sq.m to 127 sq.m; 31 no. units of house types C1 and C2 consisting of 2 storey, 4 bed detached houses of c.157 sq.m.; 9 no. units of house types D1 and D2 consisting of 3 storey 5 bed detached houses of c. 219 sq.m for type D1 and c. 247 for type D2; 16 no. units of house types E1 and E2 consisting of 3 storey, 4 bed semi-detached housesof c. 226 sq.m for type E1 and c.195 sq.m for type E2; 9 no. units of house type F consisting of 2 storey 5 bed detached houses of c. 206 sq.m; 20 no. units of house types G1 to G3 consisting of 2 storey, 3 bed semi-detached/ terraced houses of c. 128 sq.m each; and 10 no. units of house type H consisting of 2 storey, 4 bed semi-detached houses of c. 143 sq.m each. The proposed development also includes a creche facility with a GFA of 709 sq.m; 2 new vehicular entrance to the site , one from the west (R121 Church Road) and one from the east (the Ratoath Road) ; individual house entrances from the R121/Church Road; all associated site and infrastructural works including foul and surface water drainage; surface car parking; public open spaces measuring 5.74 hectares; landscaping, boundary treatment; new internal roads, cycle paths and footpaths; all on a site of approximately 27.3 hectares. In addition the proposed developement provides for the reservation of approximately 3 hectares of the total site area for the future provision of a new public secondary school.. An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with the planning application. SIGNIFICANT FURTHER INFORMATION HAS NOW BEEN RECEIVED

MDY Residential Construction

Applicant
Gembira Ltd.
53 Merrion Square South
Dublin 2

Architect
McCrossan O’Rourke Manning Architects
4 Adelaide Court
Adelaide Road
Dublin 2
01 478 8700 | arch@mcorm.com | www.mcorm.com

Architect
John Spain Associates
50 Upper Mount Street
Dublin 2
Co. Dublin
01 6625803 | info@johnspainassociates.com | www.johnspainassociates.com

Consultant
Doyle & O’Troithigh Landscape Architecture
296a Block D
Beechwood Court
Stillorgan
087 2674196 | linda@doyle-otroithigh.com | www.doyle-otroithigh.com

Consultant Engineer
Waterman Moylan
Marine House
Clanwilliam Place
Dublin 2
01 6648900 | info@waterman-moylan.ie | www.watermangroup.com

Contractor
MDY Construction Ltd.
Staplestown
Naas
Co. Kildare
045 909800 | post@mdy.ie | www.mdy.ie