The proposed development comprises the demolition of an existing single storey outbuilding (boiler house) and the removal of an existing surface level ancillary car park and associated vehicular access together with site clearance (including tree removal) and ground works to facilitate the redevelopment of the site. The proposed redevelopment of the site comprises the provision of a new 3-storey building to accommodate Offices / Administration, Auditorium and Classrooms and Entrance Lobby / Café, together with showers / changing and toilet facilities all at ground floor level. A small mezzanine level sits above the entrance lobby to provide further ancillary breakout space. At first floor level the building is arranged to provide office / admin space and meeting rooms along with teaching rooms. An external roof terrace (182 sq.m) is provided on the western side of the building at first floor level above the entrance lobby / café. The proposed second floor comprises medical related research labs with ancillary lab spaces and ancillary offices and meeting room. The proposed building provides a total of 4,097 sq.m of Gross Floor Area (GFA, excluding the external roof terrace and replacement boiler house). A new vehicular access with associated access and egress control barriers is proposed in a revised position to the north of the proposed building and south of the existing HSE Academic Building to serve the proposed ancillary surface level car park that will provide a service bay, 34 no. car parking spaces and a bicycle storeroom to provide 36 no. bicycle storage spaces. An additional 36 no. bicycle storage spaces (18 no. Sheffield type stands) are provided. Other works include the provision of a single storey, detached boiler house (15 sq.m), taxi drop-off and outdoor refuse storage enclosures together with associated works including site clearance and ground works, landscaping works and provision of external lighting and associated infrastructure provision to serve the car park (including underground surface water storage attenuation tank).

To find out more details on this Office Development in Dublin Applied for on 2019-12-17 take the free trial here.


Address:
Connolly Hospital

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL