Permission for the demolition of the vacant four storey administration building, part of a two storey extension to the production building that provides staff changing rooms and toilets, offices and meeting rooms and a single storey medical block (total 2,110 sqm), the construction of two storey 3,800 sqm extension to the Pottery Road frontage to provide additional manufacturing and assembly floor area, offices, work areas and quality control laboratory at ground floor and a customer care centre, support area and canteen at first floor level; the installation of a panelised perforated metal screen above the existing single storey utility centre fronting Pottery Road and the reconfiguration of the existing surface car parking area along the Pottery Road frontage of the premises.
To find out more details on this Medical Centre Development in Dublin Started on 2015-03-19 take the free trial here.