(a) an extension to the main building comprising the construction of an extended production hall with mezzanine plant space overhead, a predominantly 2 storey (part 3 storey) production support/utility block, expansion of the existing control room, a single storey loading bay, and roof access stairwell, all on the south side of the existing building (5,005 sqm);
(b) the construction of a new plant and equipment to the rear of the building, including storage tanks, bunds, piperacks, a 15m high stack, and 2 new truck loading bays,
(c) the relocation of an existing chemical storage shed (35 sqm),
(d) the construction of an additional water retention pond along the southern boundary, and associated site works. A natura impact statement has been prepared in respect of this planning application

To find out more details on this Factory Development in Limerick Applied for on 2018-12-20 take the free trial here.


Address:
National Technology Park

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL