Amendments to the permitted logistics/warehousing scheme under SDCC Ref: SD15A/0309 (An Bord Pleanála Ref. PL06S.246392), as subsequently amended by SDCC Ref. SD17A/0362. The proposed amendments relate primarily to permitted Unit B and Unit C and consist of:
(1) Omission of Unit C and provision of enlarged Unit B (increasing from 10,967sq.m GFA to 18,617sq.m GFA) with a height of c. 17.65m including mezzanine level. The previously permitted Units A, B and C resulted in a total of 32,771sq.m. The proposed units A and B result in a total of 29,454sq.m. which results in an overall reduction of 3.317sq.m. GFA.
(2) The proposed Unit B incorporates 690sq.m GFA of ancillary office space (a reduction of 386sq.m compared to the combined permitted ancillary office space within permitted Unit B and C).
(3) Omission of one vehicular entrance and associated bridge between permitted Unit B and C and replacement with two vehicular entrances and associated bridges to either side of proposed Unit B.
(4) Relocation substation.
(5) Reduction in car parking spaces from 329 to 235; 54 bicycle parking spaces are proposed to service Unit B.
(6) Resultant amendments to site layout, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works.
To find out more details on this Light Industrial Development in Dublin Started on 2018-11-08 take the free trial here.