Planning permission for development at this siteCharlemont House (formerly known as McConnell House), 18-21 Charlemont Place, Dublin 2. The application site comprises 0.1132 hectares and is bounded by the LUAS Green Line and Hilton Hotel to the west, Charlemont Place and the Grand Canal to the south, an unnamed laneway, the Glennon Building, no. 1 Harcourt Mews to the east and an undeveloped site to the north. The development will consist of the demolition of the existing office building, Charlemont House, with a gross floor area of 1,598 sq.m and the construction of a part four and part six storey over basement office building with a gross floor area of 4270sq.m (net office area of 3277sq.m). The maximum height of the proposal is 24.55m. The development includes a terrace and roof garden at fourth floor level and a basement level landscaped courtyard. Balconies are provided at second and third floor levels on the southern elevation. A screened plant area is provided at roof level. Access to the development is proposed via the existing laneway off Charlemont Place to the east of the application site. The development includes the provision of 10 no. car parking spaces, 42 no. bicycle parking spaces and a motorcycle space at basement level. Access to the car parking spaces is provided via proposed car lifts from the existing laneway off Charlemont Place. The development includes site development works, hard and soft landscaping and all other ancillary works.
To find out more details on this Office Development in Dublin Started on 2017-10-09 take the free trial here.