The contract consists of the provision of a biological secondary treatment process (the Works) that will result in the expansion of the existing Ringsend Wastewater Treatment Works by a Population Equivalent of 400,000. The Works are located within the existing operational Ringsend WWTP and will involve substantial interfaces with the existing facilities and the incumbent WWTP operator. The incumbent WWTP operator will be responsible for undertaking some works at the interface points. The outline design (including layout and general arrangement of facilities) for the Works has been produced by the Contracting Entity

To find out more details on this Water & Sewerage Development in Dublin Started on 2018-02-21 take the free trial here.


Address:
Ringsend Wastewater Treatment Plant

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL