An Integrated Tourism Development comprising the following works at Dundrum House Hotel, Dundrum: a) Construction of a two-storey boutique whiskey distillery and service yard with borehole for water supply and associated car-parking, in lieu of previously approved (10/317) three-storey dormer, forty-four bedroom Hotel and Conference Centre. b) Construction of a Golf Course Maintenance Building and associated storage areas. c) Construction of a Bottling Plant and whiskey storage area, including ancillary stores. d) Demolition of existing Hotel Entrance Lobby and associated circulation areas, and demolition of existing Basement stores and services spaces. e) Construction of a two-storey over partial existing basement building to the North West of existing hotel, comprising replacement Function Room with additional floor area. Pre-event space, circulation areas, Meeting Rooms, increased basement area for service areas, sanitary facilities, plant rooms, kitchens and storage areas. f) Construction of new two-storey building over existing basement, adjacent to Protected Structure S023 to comprise Hotel Entrance Foyer, lobbies, reception, circulation and mezzanine areas. g) Alterations to Protected Structure S023 comprising removal of existing lift shaft, installation of new lift, alterations to external opes to connect to new extension, internal alterations to room layouts, repairs to building fabric including floors, walls, roof, windows and doors, construction of pediments and hipped roofs to existing wings and installation of mechanical and electrical services. h) Landscaped gardens to South West and North East of Protected Structure S023, including hard and soft landscaping. i) Retention of revised layout of previously approved (10/317) Golf Driving Range and associated facilities, including new Practice Green. j) Associated car parking, roadways, site services, landscaping, screening, site boundaries, upgrade works to existing waste water treatment plant and all associated site development works. All works to be carried out within the curtilage of Dundrum House Hotel which is a Protected Structure Ref. S023 in the South Tipperary County Development Plan 2009 – 2015 and to connect to the existing Waste Water Treatment facility constructed under Permission 04/1239.

To find out more details on this Light Industrial Development in Tipperary Applied for on 2018-10-23 take the free trial here.


Address:
Dundrum House Hotel

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL