20 May 2022
Unit P1 Sub Station commenced construction.
The proposed development consists of the following: The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building (Unit P1) with a gross floor area (GFA) of 6,593 sq.m. (including 1,064 sq.m. o ancillary office space and reception areas over two levels). The proposed building will have a maximum height of 11 metres.Provision of 66 no. car parking spaces, 2 no. motorbike parking spaces, 33 no. bicycle parking spaces, 26 no. van parking spaces, and 30 no. HGV parking spaces.Provision of an ESB substation and switchroom (36m2), security hut (18m2) 3 no. cycle shelter structures, 2 no. smoking shelters, bin store (10m2), recycling store (17m2), a standalone maintenance/services building (67m2).Provision of service yard and HGV and van loading/unloading areas with associated loading bays to the north, south and west of the proposed warehouse/logistics building.Provision of access arrangements to the proposed development including an extension of permitted Estate Road Number 2, connecting to the road infrastructure permitted under Reg Ref FW20A/0187, along with pedestrian/cycle infrastructure to Estate Roads Number 2 and 3.Provision of signage zones and stand-alone totem sign associate with the proposed unit.The proposal includes landscaping and planting, boundary treatments, site lighting, 3 no. flag poles, security fencing and gates, and all associated site services and development works including underground foul and storm water draingage network and sustainable urban drainage systems.The proposed development is located to the sought of the development permitted under Reg. Ref. FW20A/0187 (known as Site N development).A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this planning application.
To find out more details on this Warehouse Development in Dublin Started on 2022-05-18 take the free trial here.