The development will consist of: (a) The demolition of the existing clubhouse building and ancillary structures; (b) The construction of a new 2 storey clubhouse building comprising 6 no. changing rooms, 2 no. referee rooms, treatment room, kit and store rooms, multi-purpose room, bar, kitchen, storage and toilets at ground floor level, and gymnasium, changing rooms, physiotherapy suite, bar/lounge, kitchen, offices, storage, toilets, staff accommodation and plant room at first floor level; (c) Alterations to existing car parking provision on site reducing spaces by 10 no. from 197 no. to 187 no. (inclusive of 9 no. disabled spaces); (d) The provision of cycle stands for 48 no. bicycles, 7 no. motorcycle parking spaces and 2 no. coach parking spaces; (e) The construction of a single storey ESB substation and switchroom building and a bin store enclosure along the eastern boundary; (f) Installation of signage on the southern elevation of the new clubhouse building; and (g) Associated site development and external works including paving and landscaping, improvements to the access to the site from Merrion Road – resurfacing, the provision of a footpath and security gates, replacement of existing lights to access and parking areas, foul and surface water drainage including a subterranean attenuation tank and the provision of two enclosed areas for the storage of ground maintenance equipment, one in the northern corner and one in the south east corner of the site.
To find out more details on this Sport & Leisure Development in Dublin Applied for on 2020-02-13 take the free trial here.