EXTENSION OF DURATION OF PLANNING PERMISSION KA101227: 1) A concrete batching facility to include; aggregate storage bins, control office (9.5m2), weigh hopper, conveyors and cement silo. The overall height of the plant above ground level will be 27.85 metres; 2) Factory (3940m2) for the manufacturing of hollow core precast concrete flooring including all ancillary works, the overall height of the factory above ground level will be 14 metres; 3) Product storage area (2.8 hectares), toilets/shower, changing room & office facility (44m2) and associated effluent holding tank (13.25m2); water settlement tanks (82m2); and all ancillary works. The development will cover an area of 5.5 hectares within the existing permitted sand & gravel/quarry area (quarry ref. QY/24).
To find out more details on this Factory Development in Meath Started on 2018-07-20 take the free trial here.