Protected structure: the works include the removal of the two-storey prefabricated buildings and the demolition of the original church, currently used as a gym, in order to construct a new three-storey over basement building incorporating a new gym + ancillary storage at basement level, fitness suite at basement mezzanine level, library, canteen and social space at ground floor level, 2 no. Science rooms with associated preparation room tiered lecture hall and computer rooms at first-floor level, 2 further science rooms with associated preparation room, 2 no. Technical graphics and upper level of the tiered lecture hall at second-floor level, arts + crafts room on the southern side and open soft surfaced recreational area on the northern side at third-floor level together with other ancillary spaces for offices, toilets + service rooms at various levels. Solar panels and north light roof windows will be fitted at roof level over the arts + crafts room. Surface water will be harvested.
To find out more details on this School Development in Dublin Applied for on 2020-07-20 take the free trial here.