The application site comprises an area of c. 1. 47 hectares. Permission is sought for the construction of a biodiesel manufacturing facility producing up to 25,000 tonnes of biodiesel per annum. The facility comprises: a process building (maximum height of c. 23m) of c. 3,284 sqm gross floor area (gfa) and associated tank farm (consisting of 12 no. external storage tanks, cooling unit, fertiliser silo, loading/uploading station); weigh bridge; security building (c. 33 sqm gfa); 22 no. car parking spaces; 5 no. Hgv parking spaces; overground pipe racks linking to the existing rendering plant and wastewater treatment plant; a pipe bridge linking the process building and tank farm; and all ancillary site development, landscaping and boundary treatment works above and below ground. The maximum height of the proposed development is the c. 25 m stack adjoining the column tower of the process building. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Pollution Prevention and Control Licence (now replaced by an Industrial Emissions Licence). An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with the application
To find out more details on this Factory Development in Meath Started on 2018-01-08 take the free trial here.