(1) Demolition of existing single and two storey post primary school buildings (1050sq.m) to the east of the main school buildings. (2) Construction of a part two, part three storey post primary school extension (3346sq.m in total) configured as follows; (a) three storey extension (1817sq.m) north of main school building along the Lucan Road forming a new post primary school pedestrian entrance off the Lucan Road, (b) two storey extension (1340sq.m) to the east of main school buildings, (c) two storey extension (escape stairs 55sq.m) to the south of main school buildings on the west side of the two storey classroom block, (d) single storey extension (133sq.m) at first floor north of the existing PE hall. (3) Reconfiguration of the existing vehicluar and pedestrian access off Lucan Heights to form the main post primary school vehicular entrance and secondary pedestrian entrance. (4) The reconfiguration of the existing primary school pedestrian entrance in its current location off the Lucan Road and the re-designation of the existing post primary school vehicular entrance as the primary school vehicular entrance. (5) All associated site works.

To find out more details on this School Development in Dublin Granted permission on 2016-10-10 take the free trial here.


Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL