Planning permission is sought for construction of a new single storey equipment storage warehouse to the West of the existing project store with a floor area of 582.6sqm and 8m in height above ground, new two-storey training and development building to the Eastern side of the existing North South access corridor with a floor area of 836.6sqm and 11.6m in height above ground. A single storey cafeteria extension to the West of the existing administration building with a floor area of 154.8sqm and 3.3m in height above ground, a single storey office extension to the East of the existing administration building with a floor area of 154.8sqm and 3.3m in height above ground. A two-storey office and storage extension to the South of the existing East West connecting corridor at Production Building 1 with a floor area of 385.9sqm and 9.64m in height above ground. A two-storey office and storage extension to the South of the existing East West connecting corridor at Production Building 2 with a corridor at Production Building 2 with a floor area of 448.1sqm and 9.64m in height above ground. A two-storey extension to the south of the existing NIPBI office building. The extension to the NIPBI building is to be built in 2 phases. Phase 1 will consist of ground floor offices with a floor area of 387.7sqm and a first floor plant room with a floor area of 96.5sqm and a maximum 5.88m in height above ground. Phase 2 will consist of ground floor offices with a floor area of 150sqm and a ground floor cafeteria of 74.5sqm and a maximum of 3.15m in height above ground. An extension to the Southern end of the existing surface level car park for an additional 40no. cars is included in this application. The development will include all associated on-site infrastructure.

To find out more details on this Warehouse Development in Cork Granted permission on 2015-03-18 take the free trial here.


Address:
Raheens

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL