(1) demolition of existing dilapidated ground floor & first floor accommodation to the rear of the main hotel building namely function room, toilets, kitchen, outbuildings and bedrooms (2) refurbishment of existing main hotel building to provide bar & restraunt at ground floor level and 3 no. Refurbished en-suite bedrooms at both first & second floor levels; (3) construction of new two storey extension to rear of the hotel (1258 m2) which will consist of (a) new reception area, bar, wc facilities, stairs & lift, kitchen, function room (with associated bar & wc facilities), cafe , laundry & storage areas all at ground floor level (b) 12 no. New ensuite bedrooms at first floor level with associated storage accommodation (4) replacement of existing canopy & porch to front of the building with new traditional style cast iron frame glazed canopy with reinstated signage (5) construction of 2 no. Dormer windows at 2nd floor level to front of main hotel building, along with provision of new ca

To find out more details on this Hotel & Guesthouse Development in Donegal Applied for on 2020-05-08 take the free trial here.


Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL