Extension of Duration: Construction of wind farm, consisting of 15 wind turbines of up to 3mw capacity each of up to 85m hub height and up to 100m blade diameter with a total height not exceeding 135m, a permanent meteorological logical lattice mast 85m high, a substation and associated equipment, a borrow pit, internal site tracks, site drainage and associated works.

To find out more details on this Power Generation Development in Donegal Granted permission on 2014-02-13 take the free trial here.


Address:
Carrickalangan

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL