The development will consist of change of use from warehouse to new live art studios, gallery and performance spaces with associated and ancillary accommodation. The works will include internal alterations to the existing building structure and minor works to the building frontages. Internal works will include the removal partitions and the formation of new door openings, the addition of toilets, stairs and ramps throughout the building, the provision of small studio spaces, a cafe and ancillary spaces, and the addition of approx. 300 sq. M. New floor area at the upper level. Externally, the works include new double glazed doors/windows at ground level in what are currently the vehicular entrances, replacement of the remainder of the windows on Arran Street East, new windows to the currently blocked up openings to no. 12 Marys Abbey, a new 1. 4m wide roller shuttered opening in the wall to meetinghouse lane and re-painting of the street frontages of the premises.
To find out more details on this Sport & Leisure Development in Dublin Granted permission on 2018-12-11 take the free trial here.