Development will consist of an increase in the maximum overall dimensions of the 14 no. Permitted wind turbines (from 126 m to 135 m); substitution of 2 no. Permitted guyed anemometer masts with 2 no. Free standing anemometer masts with a height corresponding to the amended wind turbine towers; realignment of the access to a number of wind turbines; and all associated site works, above and below ground

To find out more details on this Power Generation Development in Cork take the free trial here.


Address:
Castlepook North

Stage:
Plans Withdrawn/Invalid


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL