Alterations and extensions to permitted pharmaceutical production building, new product technology laboratory (formerly known as organic synthesis plant
2). The works include the following;
i) a two storey extension at first floor level on the north west side,
ii) a two storey extension at second floor level on the east side
iii) a one storey extension to the east and west of the existing plant room at third floor level,
iv) a one storey vertical extension of the existing lift at third floor level,
v) a one storey vertical extension of the existing north western stairs at second floor level,
vi) a four storey extension at ground floor level to the south, vii) an external drum warmer pad with canopy over the south and viii) minor elevational changes at production facility. The proposed development is covered by an existing industrial emissions directive licence no. P0013-04. The development refers to a modification to an establishment to which the major accident directive applies.
To find out more details on this Light Industrial Development in Cork Applied for on 2018-12-20 take the free trial here.