An extension to the existing bio-medicines manufacturing facility (proposed gross floor area c. 19,116sq. M), including (i) a new part single-storey, part two-storey over basement production building, including mezzanine floors (c. 11.054sq. M and maximum height 24.45m); (ii) 3 no extensions to the existing warehouse building (c. 4,890sq. M and maximum height 18. 2m), to include a new part single-storey, part two-storey waste management and dispensing area; a new single-storey high bay warehouse; a new single-storey finished goods area; and a single storey extension to the existing link corridor to connect the proposed production building with the existing facility; (iii) a new four-storey extension to the existing administration and laboratory building, including a single-storey extension to the existing cafeteria (c. 3,100sq. M and maximum height 22. 2m); new single-storey drum store (c. 72sq. M and maximum height 6. 15m); (iv) extension to the existing on site waste water treatment.
06/10/2017: Work is due to begin later this month and is expected to take two years.
To find out more details on this Factory Development in Cork Started on 2017-10-09 take the free trial here.