(1) reduced level excavations to existing rock embankment to facilitate extension of the building. The excavation work may necessitate rock breaking using a controlled blasting technique in conjunction with mechanical rock breaking activity. The works will necessitate stockpiling of excavated rock material on site and (2) extensions to existing fish processing facility consisting of general production areas and ancillary accommodation.