PROTECTED STRUCTURE: The proposed development comprises a change of use of part of the ground floor (approximately 44 sq.m in area) of the building from retail/shop to office use together with the refurbishment of the building and internal and external alterations to the building. Internal alterations to the building are proposed to include the reconfiguration of the lift- / stair- and services core from the basement through to third-floor level. A reconfiguration of the basement level layout to include the provision of 2 no. car parking spaces; 25 no. bicycle storage spaces; revised plant layout; bin store provision together with the provision of ancillary staff facilities to include male and female WCs and shower / changing rooms plus a wheelchair accessible WC. Removal and rearrangement of partitions throughout the building at the ground to third-floor level to provide revised floor layouts, including revised lift- / stair- and services core. In addition to male and female WCs at the ground to third-floor levels, a wheelchair accessible WC is also provided on each floor. Non-original fabric and alterations to the building, including fittings, fixtures, partitions and suspended ceilings are proposed to be removed to reveal the original Hennebique concrete structure throughout the new internal office fit-out. Proposed external alterations and works of refurbishment and enhancement include the provision of a platform lift to the front steps; removal of all existing windows and installation of new windows throughout, and the removal of existing plant and the provision of the new external plant to the rear of the building at ground floor level. Other external alterations include the removal of the structural braces to the south-west, rear corner of the building and the removal of an existing external, metal fire escape stairs to the south-west corner of the building and the provision of a new, weather proofed replacement metal fire escape stair. The replacement stair will continue to provide a means of escape from the adjoining Hely Building and will also combine at the lower level with the external escape stairs serving the nearby Dame Court Building to the south-west. A new internal drainage system is proposed together with all associated site works.

To find out more details on this Office Development in Dublin Started on 2020-03-13 take the free trial here.


Address:
Fumbally Exchange

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL