The demolition of 4 no. detached uninhabited dwellings (Tyrrells Field, No. 1 Church Road, No. 3 Church Road and Ardrium House). The construction of a new nursing home ranging 3 to 5 No. storeys over basement with total internal floor area of 8,319 sq.m. inclusive of Retail/GP facility of internal floor area of 253 sq.m. at basement level (Excl. basement parking) and comprising 145 no. bedrooms (161 no. bed spaces) with communal living spaces, dining areas, shared communal facilities, examination room and general administrative areas; 3 no. external landscaped garden decks at ground floor level and a roof garden at fourth floor level, south and north facing balconies on first, second, third and fourth floor levels and a roof terrace at fifth floor level, the basement will contain staff changing rooms, laundry room, ESB sub-station, switch room, mechanical plant room, bin store, cycle parking (30 spaces) and car parking (72 spaces). The site has a total area of 0.53Ha. The development also consists of a new vehicular entrance onto Bridge Street, and new boundary treatments onto Bridge Street and Church Road, surface car parking (5 spaces) and ambulance set down area adjacent to building entrance, bin store, drainage, landscaping and all ancillary site works.
To find out more details on this Care Home Development in Dublin Started on 2018-05-30 take the free trial here.