Construction of a storage and distribution warehouse complex with a total floor area of 25,914 m2 on a site measuring 7.0396 hectares. The development includes the following: Dry goods Warehouse measuring 22,498 m2 with an overall height of 23.5m, Central Marshalling area measuring 1830 m2 with a mezzanine floor measuring 698 M2 with an overall height of 13.15 M. Two-storey office block measuring 500 m2, Truck Maintenance workshop and truck washing facility building measuring 388m2 with an overall height of 10.20M, 1 no. ESB substation, external truck fuelling area, 1 no. free standing floodlit LED sign at the proposed site entrance, 45 no. surface car parking spaces and 20 bicycle spaces, new vehicular access off the N3-M2 Link Road with boundary treatment and attenuation areas and all other associated site development and landscaping works.
To find out more details on this Warehouse Development in Dublin Started on 2016-07-25 take the free trial here.