For the construction of a wind farm comprising 11 no. turbines with a maximum tip height of up to 131m and associated turbine foundations, hardstanding areas and drainage, tree felling and replanting, 8 no. clear span stream crossings, upgrade of existing and provision of new site tracks and associated drainage, 3 no. borrow pits and 2 no. material storage areas and associated ancillary infrastructure, use of an existing access junction to the proposed development from the public road, all associated drainage, onsite electrical substation including two control buildings and welfare facilities, a wastewater holding tank, and groundwater well, fencing, and associated ancillary infrastructure, underground MV electrical cabling and associated communications cabling between the turbines and proposed onsite substation, underground HV electrical cabling and associated communications cabling between the proposed onsite substation and the permitted Slieve Callan substation (planning reference
To find out more details on this Power Generation Development in Clare Granted permission on 2017-01-20 take the free trial here.