The redevelopment of the Briery Gap Theatre & Library Macroom, work with entail partial demolition of the existing fire damaged structure and the rebuild of a new structure and associated works on same site.
Tender
Works Contractor & PSCS for Macroom Library & Theatre Refurbishment, Main Street, Macroom, Co. Cork.
The proposed works comprise of extensive demolition works to the existing structure, consisting of a complete reconfiguration of the internal layouts and structures, demolition and removal of the existing external fire damaged structures to the rear, demolition and clearing out of the existing internal structures throughout, partial retention of three number boundary/party walls, reconfiguration of front of house facilities, auditorium space including construction of upper balcony, reconfiguration and construction of back of house facilities (library and theatre), construction of additional floor levels to front and rear. Increasing the seating capacity from 180 to 220 seats, construction of a new contemporary designed street elevation.
To find out more details on this Public Building Development in Cork Started on 2022-01-03 take the free trial here.