EXTENSION OF DURATION OF PLANNING PERMISSION REF. NO. DA/101259 – Construction of 99 no. houses comprising: 1 no. 3 bedroom detached bungalow, 1 no. two storey dormer style 4 bedroom detached house, 7 no. 2 storey 5 bedroom detached houses with attic accommodation, 26 no. 4 bedroom semi-detached houses with attic accommodation, 20 no. 4 bedroom semi-detached houses with attic level storage, 12 no. semi-detached 3 bedroom 2 storey houses and 32 no. terraced 3 bedroom 2 storey houses. The construction of a vehicular entrance to the site, the construction of internal estate roadways, cycle ways and footpaths, landscaping, boundary treatment, car parking, lighting, relocation of the existing foul sewer across the site, new surface water sewer and attenuation tanks and associated infrastructure. The site area is 3.5 hectares/8.64 acres.

To find out more details on this Residential Development in Meath Applied for on 2015-12-04 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Meath


Address:
Crenigans Banog

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL