(1) Demolition of existing rear flat roof annex building, portacabin, external utility building, external store / shed and external shelter, roadside garage / shed; (2) Construction of a new storey and a half extension (floor area 384sqm, overall ridge height 7210mm) to the rear consisting of (A-Ground Floor Level) day room, dining room, nurse station / office, treatment room, consultation room, kitchen / wash-up area, dry goods store, wet rooms, toilets, store, sluice room and ancillary corridors and stairwell, covered external walkway, (B-First Floor Level) staff room, stock room / office, staff toilets and ancillary stairwell, (3) Carrying out of alterations to the existing building and erection of new canopy at the main front entrance door; (4) Construction of new external shed / store / plant room (22sqm); (5) Construction of new vehicular entrance and car park on the western side of the site; (6) Replacement of existing septic tank system with a new proprietary tertiary effluent.

To find out more details on this Medical Centre Development in Sligo Started on 2014-03-14 take the free trial here.


Address:
Faughts Td

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL