A) various demolition (834 sq m) of dilapidated, 20th century sheds and storage facilities to the property, namely the demolition of existing late 20th century one and two storey storage facilities and steel framed buildings, the 4 storey mid 20th century grain store abutting south face of existing building, the 19th century 3 storey store to west of the site abutting the existing building and the demolition of part of the stone boundary walls to gaol road, malt vale and ayr hill, (b)refurbishment and change of use of existing malt building from industrial/warehousing use to office and retail, (c) construction of a 3-storey extension to existing north and south elevations of the malt building to provide retail and office space with ancillary facilities, (d) construction of a split level car park to the south of the site, (e) construction of a new 3-storey primary care centre (healthcare facilities) to the south of the site situated above the split level car park, (f) alterations to the western and northern facades to provide for vehicular and pedestrian access to the facilities. Vehicular access will be provided from Ayr Hill and pedestrian access will be provided from Malt Vale (g) connections to public foul and surface water sewers and public mains water (h) bin stores, temporary site signage, landscaping, parking and all necessary and ancillary site works to complete the development. The proposed development involves works to a protected structure, Ref. No. RC099

To find out more details on this Medical Centre Development in Tipperary Applied for on 2019-09-12 take the free trial here.


Address:
The Maltings

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL