Demolition of the existing administrative building (147m2); the reconstruction and extension of the existing concrete yard to facilitate the provision of a metal shearing machine, control cabin tower, conveyor and output stockpile; new non-ferrous processing building with weighbridge (530m2); store (20m2); new administration building (220m2); change of use of part of existing workshop to depollutant bay for End of Life Vehicles (ELVs) (60m2); covered car storage area for cars awaiting depollution (150m2); underground petrol tank; bunded area (41m2); gas storage compound (uncovered) (92m2); diesel tank bund (3m2); ramp; retaining/divider walls; car parking; lorry parking; new weighbridge; amendments to existing access off the Ringaskiddy Road, including new 8m wide gates; all site development works, including rock removal and earthworks; and new landscaping works and boundary treatment; new drainage works, including 3no. attenuation tanks and 3no. full flow oil interceptors; pump house (3m2); and temporary construction compound including temporary access off the Ringaskiddy Road, temporary administration building, security hut, site office, palisade fencing, gate and car parking. The proposed development also requires the removal of condition no. 26 of S/770/90 to allow raw material scrap in lots of smaller quantities than 10 tonnes to be accepted on site. All on a site of 2.4ha at the existing Hammond Lane Metal Company. Extension of Duration of Permission Granted under planning Ref: 12/5863.

To find out more details on this Factory Development in Cork Granted permission on 2018-02-09 take the free trial here.


Address:
Loughbeg

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL