West Dublin 220/110kV substation and associated works consisting of: (1) a 220/110kV Gas Insulated Switchgear (GIS) substation (approx. three hectare site) situated in the townlands of Ballybane and Aungierstown; (2) two interface compound sites (approx. 0.1ha each) to connect the existing Inchicore-Maynooth 220kV double-circuit overhead line to the proposed substation. The western interface compound is to be situated in the townland of Gollierstown and the eastern interface compound is to be situated in the townland of Kishogue; (3) a terminal tower (approx. 38.7m in height) adjacent to each interface compound; (4) an access route to the eastern interface compound (approx. 240m in length) connecting to Lynches Lane (L-5218-1); (5) an access route to the western interface compound (approx. 1.3km in length) connecting to the R120 regional road via an existing access road currently serving the Lucan Sarsfields GAA Club sports grounds; (6) four 220kV underground cables connecting the two interface compound sites with new substation; (7) one 110kV underground cable connecting the existing 110kV Corkagh substation to the proposed substation; (8) the removal of a section (approx. 3km in length) of the existing Inchicore-Maynooth 220kV double circuit overhead line and 13 existing towers. Submissions or observations mat be made only to An Bord Pleanala, 64 Marlborough Street, Dublin 1 relating to (a) the implications of the proposed development for proper planning and sustainable development and (b) the likely effects on the environment of the proposed development and may only be made for a period of 7 weeks commencing on 4/1/2016. Any submissions/observations must be received by the Board not later than 5.30pm on 22/2/2016.

To find out more details on this Power Generation Development in Dublin Started on 2017-09-08 take the free trial here.


Address:
Grange Castle/Ballybane/Aungierstown

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL