A single storey administration and machinery storage building (545sqm), a single storey secure storage building (90sqm), open steel framed storage sheds for equipment storage, vehicle wash area, top dressing & green waste recycling storage bunkers, open storage bunkers, overground bunded fuel storage tanks and associated site works including access road bicycle parking, landscaping, a 2.2m high timber perimeter fence and car parking to replace existing displaced parking on campus. The site is located circa 558 metres from plassey house (a protected structure) and circa 1234 metres from plassey mill and headrace (a protected structure). The university of limerick campus falls within an architectural conservation area.
To find out more details on this University Development in Limerick Granted permission on 2018-06-20 take the free trial here.