Demolition of all existing structures on the site (filling station building, canopy, canopy over brush wash, former storage structure and totem sign).

Construction of a two storey filling station building (912 sq.m. Gfa). The ground floor will contain a net retail area of 100 sq.m (including off-licence of 9.5 sq.m); 2 no restaurants (151 sq.m. Combined); communal seating area (74.5 sq.m); back of house (73.2 sq.m.), toilets (33.55 sq.m.) and circulation (99.47 sq.m).

One of the restaurants at ground floor will include a drive-thru hatch facility and will involve hot food for consumption off the premises. The first floor will contain communal seating (153.9 sq.m), toilets (45.45 sq.m), back of the house (38.2 sq.m.) and circulation (40.03 sq.m).

Internal and external stair access is provided. All associated works including 6 no. Pump islands, with the branded canopy over, drive-thru lane, landscaping, outdoor seating, outdoor playground, brush wash, car parking spaces.

To find out more details on this Service Station Development in Dublin Started on 2019-03-06 take the free trial here.


Address:
Santry Service Station

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL