Construction of a single storey woodchip boiler building with a parapet height of 12.4m above ground level and a maximum stack height of 16m above ground level, the construction of a trailer park for the parking of a maximum of 20 trailers, the erection of a piperack of 7.2m height typically above ground level or 1.5m height above the parapet of the existing OC building, a firewater storage tank 5m high above ground level, a pump house building 2.8m high above ground level and associated site works at their facility.

To find out more details on this Factory Development in Waterford Started on 2016-02-05 take the free trial here.


Address:
Clogherane

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL