Wind farm consisting of 16 turbines (each with a maximum hub height of 100m, maximum rotor diameter of 90m, and with a total tip height of 145m), one permanent meteorological mast, 2 borrow pits, a sub-station including a control building, new internal access roads, upgrading of existing internal access roads, expansion of drainage system, turbine hardstands, wastewater holding tank, underground cables and ancillary works. An Environmental Impact Statement accompanies this application. Previous reference number 11/51/0251.
To find out more details on this Power Generation Development in Tipperary Applied for on 2016-05-24 take the free trial here.