Permission for development consisting of
1) A two storey extension to the existing facility via provision of additional storage incorporating a dispatch area, chill area and loading area at ground floor level. Ancillary office and staff facilities at first floor level
2) An additional storage facility adjacent to the proposed extension for use as a mushroom corridor
3) The demolition and removal of 3 No. Storage sheds to incorporate additional yard space
4) The retention of 2 No. Portable cabins to the front of the site on a 2 year basis
5) The retention of car parking spaces on site
6) Additional landscaping, signage and boundary treatments
7) All ancillary site development and construction works to facilitate connection to existing foul water, storm water and service networks

To find out more details on this Factory Development in Monaghan Applied for on 2020-12-10 take the free trial here.


Address:
Tirnaneill

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL