For development which will consist of the construction of an extension (198. 3m2) to an existing warehouse (unit 7); the installation in the extension of a conditioning plant, aqueous waste storage tank and bagging unit for air pollution control residues (APCR); the acceptance of 38,000 tonnes of APCR and 2600 tonnes of aqueous waste annually, which will be in addition to the 95000 tonnes of waste currently authorised; the operation of the conditioning plant and bagging unit in the extension; the storage of the conditioned and bagged APCR in unit 7 (1455. 7m2), and the deletion of condition 3 c) of planning permission p13/585. The APCR will be classified as hazardous waste. The development will require a review of the industrial emissions licence granted by the environmental protection agency. An environmental impact assesment report (eiar) will be submitted.
To find out more details on this Warehouse Development in Kilkenny Granted permission on 2018-05-25 take the free trial here.