23 Mar 2022 An Bord Pleanala grants permission with conditions

The proposed development involves site clearance and levelling works, including the demolition of all existing buildings on site and the construction of a 148 bed hotel that ranges in height between 1 and 7 storeys above three lower ground levels (along the southern part of site) including ancillary staff and guest facilities, plant, storage and waste/refuse storage areas. An ESB substation is proposed at ground floor level at the south-eastern corner of the proposed building. Guest / pedestrian access is provided along the southern frontage onto James Street with Guest Lobby at ground floor. A combination of hard and soft landscaping measures are proposed along all elevations to enhance areas of public realm and ancillary amenity spaces. The proposed building includes for the provision of sustainable drainage measures together with the provision of green roofs. Permission is also sought for associated signage. Development of an aparthotel was previously permitted at this site, under Planning Register 2950/17 & ABP300057-17.

To find out more details on this Hotel & Guesthouse Development in Dublin Granted permission on 2022-03-23 take the free trial here.


Address:
17, 18 & 19 Moore Lane

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL