Change of use of an existing vacant development from a concrete block manufacturing facility to the storage and natural drying of 2,000 tonnes of timber, sourced mainly from the local forestry and related sectors. The proposal also includes the erection of external walls and an internal partition at an existing 6543sqm structure, to create an enclosed storage unit of 2178sqm (with the remaining 4365sqm in this feature, which is in a roofed open sided condition, not forming part of this application). This application also seeks permission for the upgrade of the existing on site wastewater treatment system, the installation of a weighbridge and permission for the retention of a 268sqm plant room and a separate vacant building containing 253.5sqm which will be used as an office in connection with this timber proposal, including a non habitable roof of 75sqm which will be used as an office store along with all ancillary works and related uses, including car parking and equipment storage.
To find out more details on this Warehouse Development in Wicklow Granted permission on 2016-07-27 take the free trial here.