Demolition of an existing single-storey detached medical waste and chemical storeroom to the rear (north) of Smurfit Building and the conversion and change of use of the existing open structure (fuel delivery bay) attached to the southern flank wall of the Boiler House to provide a new single storey, replacement medical waste and chemical storeroom together with all associated external alterations to the existing attached structure to the boiler house and associated site works to include the removal of existing gates; relocation of the existing vehicular access barrier and reinstatement/ levelling of existing car park.

To find out more details on this Hospital Development in Dublin Granted permission on 2016-12-06 take the free trial here.


Address:
Beaumont Hospital

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL