The development will comprise the provision of a food processing warehouse facility (11,696 sq m) comprising a cold store (10,955 sqm) with a maximum roof level height of 18.65 metres and a fire escape stairs extending to 19.8 metres; an ancillary office building (610 sqm) with a maximum height of 8 metres, including office space, meeting rooms, canteen locker rooms, toilet facilities and associated facilities; and 4.3-metre high driver welfare facilities building (131 sqm). The proposed development will also include the provision of a new vehicular entrance off the Food Central Access Road; internal roadways; traffic barriers; pedestrian access; 90 No. ancillary car parking spaces; bicycle parking; 52 No. trailer parking spaces level access goods, hard and soft landscaping; smoking shelter; boundary treatments; ESB substation; signage; PV panels a truck wash; a diesel tank; 2 No. diesel pumps with a layby for 8 No. trucks; weighbridge; waste storage area; lighting and associated site development works above and below ground. The scheme also includes retention permission for 33 No. trailer parking spaces (providing a total of 66 No. trailer parking spaces).
To find out more details on this Warehouse Development in Dublin Started on 2021-06-25 take the free trial here.