Permission for development that will consist of (1. ) material change of use from warehousing to production (179m2), (2.) A new internal first floor area approx. 43.5m2, to raise the roof and parapet to match the existing and incorporate a new roof light, (3.) alterations to the North elevation which will consist of the installation of a new roller shuter door, installation of two emergency exit doors, new windows, replace the existing vertical cladding with new horizontal cladding. (4.) The con
To find out more details on this Factory Development in Dublin Started on 2014-09-29 take the free trial here.