Works to the FAB10, FAB14 and FAB 24 facilities as outlined hereunder. (a) The vertical extension of 16 No. existing stacks and their housings by 5.35 metres located on the upper roof of the FAB10 building and the demolition of 2 No. existing stacks. (b) The vertical extension of 32 No. existing stacks and their housings by 6.3 metres, including the construction of additional cladded structures up to 9 metres high and new access platforms to the roof of the FAB14 facility. The works include the addition also of 2 No. roof mounted air handling units (5 metres high by 8 metres long) and a raised parapet screen, 2 metres high, on the southern elevation of FAB14. (c) The addition of 10 No. roof mounted air handling units (5.5 metres high by 21 metres long) and associated pipe structures on the roof of FAB24 and the addition of 4 No. stacks, 5.4 metres high to the south of FAB24. The works include alterations to and the addition of 1 No. additional stack 22 metres high, and associated struc
To find out more details on this Factory Development in Kildare Started on 2014-02-17 take the free trial here.