Retention of development consists of a 510 sq. M single storey temporary offices and 130 car park spaces. Planning permission for development will consist of the following (i) a new detached 2 storey 252sq. M utility building to include esb & electrical switch rooms at level 1 and control room, wc & mcc room on level 2 (ii) a detached single storey 63sq. M sprinkler pump house and associated sprinkler water storage tank (iii) 8 no. Bunded external product storage tanks with a 250sq. M covered tanker unload facility and associated pipe rack (iv) the conversion of an existing covered external chemical storage area to an internal entrance area of 130sq. M to contain a new entry ramp (v) provision of 195 new additional car parking spaces (vi) re-positioning of 2 no. Existing boundary gates and 1 new staff entrance gate which will include a covered walkway within the site boundary and all associated site development works for the above.

To find out more details on this Factory Development in Cork Granted permission on 2020-01-23 take the free trial here.


Address:
Ballytrasna

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL