Amendment to proposed windfarm including reduction from 11 no. turbines to 10 turbines (T11 removed) and micro-siting of crane pad of T5 . Turbines No.1-10 are Enercon E-70 with 64m tower and 71m rotor diameter – overall 99.5m. Control room met mast 2 no. access roads upgrade to junction at Pollee Road and Elginny Road and all associated site development works.
To find out more details on this Power Generation Development in Mid & East Antrim Granted permission on 2014-11-14 take the free trial here.