Construction of a 7 bay extension to existing manufacturing factory building incorporating a testing area and a covered drop off area to the side of the existing building (0.405 Hectares) construction of a new 3 span portal framed building to be used for sub-assembly and research/ design (0.2 hectares) formation of concrete areas throughout remainder of the site for storage and access (1.695).
To find out more details on this Factory Development in Mid Ulster Applied for on 2019-03-11 take the free trial here.